register free | resend password


Zinc One Reports High-­Grade Zinc Results from 2018 Drill Program at its Bongará Mine Project, Peru

Over 9 Metres of 43.6% Zinc at Mina Grande Sur1 / Over 7 Metres of 25.3% Zinc at Bongarita1

ID: 1534387
recent pressrelease next pressrelease

(PresseBox) - Zinc One Resources Inc. (TSX?V: Z; OTC Markets: ZZZOF; Frankfurt: RH33 ? ?Zinc One? or the ?Company? &t=6s ) has received the first drill results from the previously announced drill program at its Bongarormation towards advancement of the project going forward.

Initial Drill Results Highlights:

Mina Grande Sur

? A total of 542.9 metres completed from 33 holes (11 platforms x 3 holes each) and results for 11 drill holes reported herein.

? Mineralization at Mina Grande Sur includes zinc oxides, carbonates and silicates.

? 1Significant intercepts include:

o MGS18001 ? 5.5 metres of 26.1% zinc, starting at 3.0 metres drill depth

o MGS18003 ? 4 metres of 32.5% zinc, starting at surface

o MGS18003 ? 15 metres of 21.5% zinc, starting at 15.0 metres drill depth

o MGS18004 ? 9.1 metres of 43.6% zinc, starting at surface

o MGS18006 ? 14.1 metres of 32.8% zinc, starting at surface

Bongarita

? A total of 587.2 metres completed from 36 holes (12 platforms x 3 three holes each) in an area approximately 100 metres x 150 metres and results from 13 drill holes are reported herein.

? Mineralization at Bongarita includes zinc silicates hosted exclusively by soils.

? 1Significant intercepts include:

o BO18005 ? 11.5 metres of 16.0% zinc, starting at surface

o BO18005 ? 5.7 metres of 29.2% zinc, starting at 5.8 metres drill depth

o BO18007 ? 7.0 metres of 25.3% zinc, starting at surface

Jim Walchuck, President and CEO of Zinc One commented, ?The results of the drill program at Bongarne at Bongarita and the results we have received thus far have been very encouraging.

The results from the program will also contribute to the upcoming resource estimate and PEA planned for 2018. Overall, we could not be more pleased with the drill progress and results to date.?

Geology and Discussion of Results



The zinc mineralization at Bongar a previous press release, are the primary zinc minerals that are hosted primarily by heavily

Significant results, including drill holes. Both maps also include the recent channel and pit sampling locations previously reported.

Figure 1. Bongar

https://zincone.com/projects/bongara

Figure 2. Bongar

https://zincone.com/projects/bongara-

Sampling and Analytical Protocols

Zinc One follows a systematic and rigorous Quality Control/Quality Assurance program overseen by Dr. Bill Williams, COO and Director of Zinc One.

The sample from each core run is placed in a 60 centimetre long, plastic core box that has five columns. Core recovery, rock quality designation (?RQD?), and geologic features are logged and sample intervals, which are generally <2 metres, are chosen. Each core box is photographed and then sampled with a spatula (soil and heavily

Qualified Person

The technical content of this news release has been reviewed, verified and approved by Dr. Bill Williams, COO and Director of Zinc One, a qualified person as defined by National Instrument 43

About Zinc One Resources Inc.

Zinc One is focused on the exploration and development of prospective and advanced zinc projects in mininginc price. Past production included >20% zinc grades and recoveries over 90% from surface and nears managed by a proven team of geologists and engineers who have previously constructed and operated successful mining operations.

Forward

Information set forth in this news release contains forward?looking statements that are based on assumptions as of the date of this news release. These statements reflect management?s current estimates, beliefs, intentions and expectations. They are not guarantees of future performance. Zinc One cautions that all forward looking statements are inherently uncertain and that actual performance may be affected by many material factors, many of which are beyond their respective control. Such factors include, among other things: risks and uncertainties relating to Zinc One?s limited operating history, its proposed exploration and development activities on the Bongar

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the Exchange) accepts responsibility for the adequacy or accuracy of this release.

1 Given that the strike and dip of the mineralization is not known, the intercepts do not necessarily represent true thicknesses; moreover, long intercepts, e.g., MGS18



More information:
http://https://



Keywords (optional):



Company information / Profile:

PressRelease by

Requests:



PressContact / Agency:



published by: PresseBox
print pressrelease  send to a friend  

Date: 03/30/2018 - 13:04
Language: English
News-ID 1534387
Character count: 8969
Kontakt-Informationen:
Firma: Swiss Resource Capital AG
Ansprechpartner: Feedback to businesspress24.com about Pressrelease-id:
Stadt: Vancouver, BC
Telefon:

Meldungsart:
Versandart:
Freigabedatum:
Comments:



Number of hits: 988

Linking-Tips:



Direct Link to this PressRelease:






We would appreciate a link in your News-, Press- or Partner-Site.

Comments on this PressRelease






All members: 9 348
Register today: 1
Register yesterday: 1
Members online: 0
Guests online: 47


Don't have an account yet? You can create one. As registered user you have some advantages like theme manager, comments configuration and post comments with your name.