register free | resend password


Zinc One Reports Drill Results from Mina Grande Centro, Bongará Zinc Mine Project, Peru

31.8 Metres of 28.2% Zinc and 18.0 Metres of 26.2% Zinc

ID: 1540988
recent pressrelease next pressrelease

(PresseBox) - Zinc One Resources Inc. (TSX-V: Z; OTC Markets: ZZZOF; Frankfurt: RH33 ? ?Zinc One? or the ?Company? - http://www.commodity-tv.net/c/search_adv/?v=298394) is pleased to announce the results from 29 of the 64 holes drilled in the Mina Grande Centro zone, Bongar

Jim Walchuck, President and CEO of Zinc One commented, ?The Mina Grande Centro drill program successfully confirmed the near-surface zinc mineralization that was left behind by previous mining activity and clearly showed that additional high-grade mineralization has yet to be delineated to the northeast.

Mina Grande Centro Drill Results Highlights:

Significant new intercepts include:

[list]

MGC18012 ? 31.8 metres of 28.2% zinc, from 18.0 metres drill depth

[list]

True vertical thickness of 22.5 metres from true vertical depth of 12.7 metres

MGC18008 ? 15.0 metres of 28.9% zinc, from surface

True vertical thickness of 15.0 metres

MGC18023 ? 18.0 metres of 26.2% zinc, from 13.5 metres drill depth

True vertical thickness of 12.7 metres from true vertical depth of 9.5 metres

Mineralization at Mina Grande Centro includes zinc oxides, carbonates and silicates hosted by soils, highly-weathered carbonates, and fine- to coarse-grained dolomites, most of which are brecciated.

[/list]

[/list]

Mina Grande Centro is a part of the Mina Grande zone, one of the three zones of high-grade, near-surface zinc-oxide mineralization along a 1.4 kilometre mineralized trend that was tested by this drill program consisting of 264 holes for 7,930 metres. Drill results at Mina Grande Norte and the remaining drill holes at Mina Grande Centro will be released in the coming weeks.

Geology and Discussion of Results

The zinc mineralization at the Bongar

The results from drill holes MGC18001 through 029 at Mina Grande Centro can be found below in Table 1.www.zincone.com.



Sampling and Analytical Protocols

Zinc One follows a systematic and rigorous Quality Control/Quality Assurance program overseen by Dr. Bill Williams, COO and Director of Zinc One.

The sample from each core run is placed in a 60-centimetre long, plastic core box that has five columns.<2 metres, are chosen. Each core box is photographed and then sampled with a spatula, if soil or heavily-weathered rock, or cut with a core saw, 50% of which is placed in a sample bag and stored on site in a secure location. The Company independently inserts certified control standards, blanks, and duplicates, all of which comprise at least 20% of the sample batch, to monitor sample preparation and analytical quality.

Qualified Person

The technical content of this news release has been reviewed, verified and approved by Dr. Bill Williams, COO and Director of Zinc One, a qualified person as defined by NI 43-101.

About Zinc One Resources Inc.

Zinc One is focused on the exploration and development of prospective and advanced zinc projects in mining-friendly jurisdictions. included >20% zinc grades and recoveries over 90% from surface and near-surface zinc-oxide mineralization. High-grade, zinc-oxide mineralization is known to outcrop between the mined area and the Charlotte Bongar

Forward-Looking Statements

Information set forth in this news release contains forward-looking statements that are based on assumptions as of the date of this news release. These statements reflect management?s current estimates, beliefs, intentions and expectations. They are not guarantees of future performance. Zinc One cautions that all forward looking statements are inherently uncertain and that actual performance may be affected by many material factors, many of which are beyond their respective control. Such factors include, among other things: risks and uncertainties relating to Zinc One?s limited operating history, its proposed exploration and development activities on the Bongar as required under applicable securities legislation, Zinc One does not undertake to publicly update or revise forward-looking information.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the Exchange) accepts responsibility for the adequacy or accuracy of this release.



More information:
https://www.realwire.com/releases/Off-Grid-Energy-charge-ahead-with-smart-solution-for-EV-grid-constraints https://www.stepover.com/ https:// http://snip.ly/sfx11e https://



Keywords (optional):



Company information / Profile:

PressRelease by

Requests:



PressContact / Agency:



published by: PresseBox
print pressrelease  send to a friend  

Date: 09/11/2018 - 11:07
Language: English
News-ID 1540988
Character count: 3383
Kontakt-Informationen:
Firma: Swiss Resource Capital AG
Ansprechpartner: Feedback to businesspress24.com about Pressrelease-id:
Stadt: Vancouver, BC
Telefon:

Meldungsart:
Versandart:
Freigabedatum:
Comments:



Number of hits: 270

Linking-Tips:



Direct Link to this PressRelease:






We would appreciate a link in your News-, Press- or Partner-Site.

Comments on this PressRelease






All members: 9 374
Register today: 0
Register yesterday: 0
Members online: 0
Guests online: 55


Don't have an account yet? You can create one. As registered user you have some advantages like theme manager, comments configuration and post comments with your name.