register free | resend password


Goliath Drilling Intersects High Grade in East Expansion Target and Drills 20.8m of 3.4 g/t Au in Main Zone

ID: 1556766
recent pressrelease next pressrelease

(PresseBox) - Treasury Metals Inc. (TSX: TML) (?Treasury? or the ?Company? - https://www.commodity-tv.com/play/treasury-metals-new-c-zone-will-increase-production-and-resource-profile/ ) is pleased to announce the first assay results from its expansion drilling in the Eastern Main Zone and additional assays from the Infill drilling in the Main Zone at the Goliath Gold Project located in northwestern Ontario.

Highlights include:

TL20-524 intersected 4 g/t over 20.8 m including 9.1 g/t Au over 4.0 m in the Main Zone Infill program. TL20-524 exhibits anticipated results of an extended mineralized zone with high-grade assays.

Expansion drill hole TL20-517 intersected 6 g/t Au over 4.4 m in the Main Zone and 10.6 g/t Au over 1.0 m in a hanging wall zone

Expansion drill hole TL20-512 intersected 0 g/t Au over 7.0 m including 5.4 g/t Au over 3.4 m

?We are encouraged with these new Main Zone results that further demonstrate the consistency of mineralization across the high-grade shoots in the deposit. This complements the program?s success in the developing C Zone East area spanning 200 metres along strike by 150 metres down-dip where drilling is now consistently hitting mineralization in both zones (Main and C Zone) along strike. These drill results along with the Federal Minister?s approval of the EA in August positions us well in an improving gold market,? stated Greg Ferron, CEO.

Eastern Main Zone Expansion Drilling:

Treasury is pleased to announce the first results of its expansion drill program of the high-grade shoots within the Main Zone. These holes were designed to drill test select targets down-dip, along strike and directly adjacent to the existing high-grade shoots as well as areas identified by recent underground mine scheduling modelling work. These targets have the potential to add ounces adjacent or below the currently defined resources (see image for additional details).



TL20-517, which was targeted to expand the lower eastern portion of the Eastern high-grade shoot within the Main Zone, intersected 4.6 g/t Au over 4.4 m with an additional hanging wall zone that found 10.6 g/t Au over 1.0 m.

TL20-512, located 100 metres up-dip of TL20-517, intersected 3.0 g/t Au over 7.0 m including 5.4 g/t Au over 3.4 m directly adjacent to the East high-grade shoot.

Infill Program:

A portion of the program has been focused on upgrading specific areas of the Main Zone shoots to the ?Measured? classification for inclusion as potential estimate ounces for the initial mine life years and for grade control purposes.

TL20-524 intersected 3.4 g/t over 20.8 m including 9.1 g/t Au over 4.0 m in the Main Zone Infill program and is located 30 metres down dip of previously reported TL19-507 which intersected 2.37 g/t Au over 19.0 m including 6.2 g/t Au over 4.0 m (see press release January 13, 2020). TL20-524 exhibits anticipated results of an extended mineralized zone with significant high-grade assays.

Qualified Person

Technical information in this press release has been reviewed and approved by Adam Larsen, P. Geo, who is the qualified person under the definitions established by National Instrument 43-101.

To view further details about the Goliath Gold Project, please visit the Company?s website at www.treasurymetals.com.

Contact:

Greg Ferron

CEO and Director

T: 1.416.214.4654

greg(at)treasurymetals.com

Mark Wheeler

Director Projects, Goliath Gold Project

T: 1.416.214.4654

mark(at)treasurymetals.com

Follow us on Twitter (at)TreasuryMetals

In Europe:

Swiss Resource Capital AG

Jochen Staiger

info(at)resource-capital.ch

www.resource-capital.ch

About Treasury Metals Inc.

Treasury Metals Inc. is a gold focused exploration and development company with assets in Canada and is listed on the Toronto Stock Exchange (?TSX?) under the symbol ?TML? and on the OTCQX

QA/QC Program:

The Company has implemented a quality assurance and quality control (QA/QC) program to ensure sampling and analysis of all exploration work is conducted in accordance with the CIM Exploration Best Practices Guidelines. The drill core is sawn in half with one-half of the core sample dispatched to Actlabs facility located in Dryden, Ontario. The other half of the core is retained for future assay verification and/or metallurgical testing. Other QA/QC procedures include the insertion of blanks and Canadian Reference Standards for every tenth sample in the sample stream. A quarter core duplicate is assayed every 20th sample. The laboratory has its own QA/QC protocols running standards and blanks with duplicate samples in each batch stream.

Forward-looking Statements

This release includes certain statements that may be deemed to be ?forward-looking statements?. All statements in this release, other than statements of historical facts, that address events or developments that management of the Company expect, are forward-looking statements. Actual results or developments may differ materially from those in forward-looking statements. Treasury Metals disclaims any intention or obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise, save and except as may be required by applicable securities laws.



More information:
http://https://



Keywords (optional):



Company information / Profile:

PressRelease by

Requests:



PressContact / Agency:



published by: PresseBox
print pressrelease  send to a friend  

Date: 03/10/2020 - 14:02
Language: English
News-ID 1556766
Character count: 7150
Kontakt-Informationen:
Firma: Swiss Resource Capital AG
Ansprechpartner: Feedback to businesspress24.com about Pressrelease-id:
Stadt: Toronto
Telefon:

Meldungsart:
Versandart:
Freigabedatum:
Comments:



Number of hits: 492

Linking-Tips:



Direct Link to this PressRelease:






We would appreciate a link in your News-, Press- or Partner-Site.

Comments on this PressRelease






All members: 9 438
Register today: 0
Register yesterday: 0
Members online: 0
Guests online: 49


Don't have an account yet? You can create one. As registered user you have some advantages like theme manager, comments configuration and post comments with your name.