(businesspress24) - Vancouver, BC (October 27, 2020) Skeena Resources Limited (TSX: SKE, OTCQX: SKREF) (Skeena or the Company - https://www.commodity-tv.com/ondemand/companies/profil/skeena-resources-ltd/) is pleased to report additional diamond drill core results from the Phase 1 combined campaign of definition and exploration drilling at the Eskay Creek Project (Eskay Creek or the Project) located in the Golden Triangle of British Columbia. Phase 2 drilling continues with nine drill rigs currently active. The Phase 2 infill program is focused on Pre-Feasibility Study (PFS) resource category conversions for the open-pit constrained resources. Reference images are presented at the end of this release as well as on the Companys website.

Eskay Creek Phase I Infill Drilling - Highlights:
- 3.96 g/t Au, 39 g/t Ag (4.48 g/t AuEq) over 28.50 m (SK-20-310)
- 25.27 g/t Au, 2,185 g/t Ag (54.40 g/t AuEq) over 3.00 m (SK-20-319)
- 3.06 g/t Au, 576 g/t Ag (10.74 g/t AuEq) over 9.00 m (SK-20-365)
- 7.82 g/t Au, 172 g/t Ag (10.11 g/t AuEq) over 12.00 m (SK-20-370)
- 5.27 g/t Au, 26 g/t Ag (5.62 g/t AuEq) over 22.07 m (SK-20-371)

Gold Equivalent (AuEq) calculated via the formula: Au (g/t) + [Ag (g/t) / 75]. True widths range from 70-100% of reported core lengths. Length weighted AuEq composites are constrained by geological considerations. Grade-capping of individual assays has not been applied to the Au and Ag assays informing the length-weighted AuEq composites. Metallurgical processing recoveries have not been applied to the AuEq calculation and are taken at 100%. Samples below detection limit were nulled to a value of zero.

Phase I Infill Drilling Confirms Modelled Mineralization

The recently completed Phase 1 portion of the infill drilling campaign at Eskay Creek confirms the predictability of the Companys 2019 Mineral Resource Estimate (MRE), which was largely informed by historical drilling results. As well, recent drill intercepts of grades and widths in the 21C Zone continue to correlate very well with the modelled Inferred mineralization (see section 10420 below).



Precious metal tenor in the 21C Zone has been upgraded from previous Phase I drill holes as demonstrated by recently completed drill hole SK-20-310 which intersected 3.96 g/t Au, 39 g/t Ag (4.48 g/t AuEq) over 28.50 m. Previously reported flanking drill holes SK-20-302 and SK-20-362 intersected 1.99 g/t AuEq over 49.16 m and 2.06 g/t AuEq over 37.00 m respectively and are situated on section less than 15 m from SK-20-310.

Exploration Update

The Company is now drilling the Phase 2 program with a total of nine helicopter supported drill rigs. 46,700 m have been drilled since the Company re-started drilling at Eskay Creek this past July. An additional two rigs are due to be on site in the coming weeks to facilitate the completion of the remaining 43,000 m to be drilled by the end of December 2020. Turnaround time for sample analysis is currently greater than 25 days and the company is awaiting analytical results for 16,900 m over 132 drill holes.

Exploration drilling at the Companys Snip gold project (Snip) will commence on October 29 with one helicopter-supported drill rig. Resource expansion drilling at Snip is budgeted at 5,000 m.

About Skeena

Skeena Resources Limited is a junior mining company focused on developing the past-producing Eskay Creek gold-silver mine located in Tahltan Territory in the Golden Triangle of northwest British Columbia, Canada. The Company released a robust Preliminary Economic Assessment in late 2019 and is currently focused on infill and exploration drilling at Eskay Creek to advance the project to Prefeasibility. Skeena is also exploring the past-producing Snip gold mine.

On behalf of the Board of Directors of Skeena Resources Limited,
https://www.irw-press.at/prcom/images/messages/2020/53983/27102020_Skeena_EN_PRcom.001.jpeg

Walter Coles Jr.
President & CEO

Qualified Persons

Exploration activities at the Eskay Creek Project are administered on site by the Companys Exploration Managers, Colin Russell, P.Geo. and Adrian Newton, P.Geo. In accordance with National Instrument 43-101 Standards of Disclosure for Mineral Projects, Paul Geddes, P.Geo. Vice President Exploration and Resource Development, is the Qualified Person for the Company and has prepared, validated and approved the technical and scientific content of this news release. The Company strictly adheres to CIM Best Practices Guidelines in conducting, documenting, and reporting the exploration activities on its projects.

Quality Assurance - Quality Control

Once received from the drill and processed, all drill core samples are sawn in half, labelled and bagged. The remaining drill core is subsequently securely stored on site. Numbered security tags are applied to lab shipments for chain of custody requirements. The Company inserts quality control (QC) samples at regular intervals in the sample stream, including blanks and reference materials with all sample shipments to monitor laboratory performance. The QAQC program was designed and approved by Lynda Bloom, P.Geo. of Analytical Solutions Ltd., and is overseen by the Companys Qualified Person, Paul Geddes, P.Geo, Vice President Exploration and Resource Development.

Drill core samples are submitted to ALS Geochemistrys analytical facility in North Vancouver, British Columbia for preparation and analysis. The ALS facility is accredited to the ISO/IEC 17025 standard for gold assays and all analytical methods include quality control materials at set frequencies with established data acceptance criteria. The entire sample is crushed and 1 kg is pulverized. Analysis for gold is by 50 g fire assay fusion with atomic absorption (AAS) finish with a lower limit of 0.01 ppm and upper limit of 100 ppm. Samples with gold assays greater than 100 ppm are re-analyzed using a 50 g fire assay fusion with gravimetric finish. Analysis for silver is by 50 g fire assay fusion with gravimetric finish with a lower limit of 5ppm and upper limit of 10,000 ppm. Samples with silver assays greater than 10,000 ppm are re-analyzed using a gravimetric silver concentrate method. A selected number of samples are also analyzed using a 48 multi-element geochemical package by a 4-acid digestion, followed by Inductively Coupled Plasma Atomic Emission Spectroscopy (ICP-AES) and Inductively Coupled Plasma Mass Spectroscopy (ICP-MS) and also for mercury using an aqua regia digest with Inductively Coupled Plasma Atomic Emission Spectroscopy (ICP-AES) finish. Samples with sulfur reporting greater than 10% from the multi-element analysis are re-analyzed for total sulfur by Leco furnace and infrared spectroscopy.

In Europe:
Swiss Resource Capital AG
Jochen Staiger
info(at)resource-capital.ch
www.resource-capital.ch

Cautionary note regarding forward-looking statements

Certain statements made and information contained herein may constitute forward looking information and forward looking statements within the meaning of applicable Canadian and United States securities legislation. These statements and information are based on facts currently available to the Company and there is no assurance that actual results will meet managements expectations. Forward-looking statements and information may be identified by such terms as anticipates, believes, targets, estimates, plans, expects, may, will, could or would. Forward-looking statements and information contained herein are based on certain factors and assumptions regarding, among other things, the estimation of mineral resources and reserves, the realization of resource and reserve estimates, metal prices, taxation, the estimation, timing and amount of future exploration and development, capital and operating costs, the availability of financing, the receipt of regulatory approvals, environmental risks, title disputes and other matters. While the Company considers its assumptions to be reasonable as of the date hereof, forward-looking statements and information are not guarantees of future performance and readers should not place undue importance on such statements as actual events and results may differ materially from those described herein. The Company does not undertake to update any forward-looking statements or information except as may be required by applicable securities laws.

Neither the Toronto Stock Exchange nor the Investment Industry Regulatory Organization of Canada accepts responsibility for the adequacy or accuracy of this release.

Table 1: Eskay Creek Project 2020 Length Weighted Drill Hole Gold and Silver Composites:


Hole-ID From To Core Au Ag AuEq Zone
(m) (m) Length (g/t) (g/t) (g/t)
(m)

SK-20-279152.50 170.518.00 2.73 9 2.85 21B
0

SK-20-307198.25 210.512.25 5.47 9 5.59 21C
0

INCLUDI207.00 208.51.50 16.55 24 16.87 21C
NG 0

AND 208.50 209.51.00 24.10 7 24.19 21C
0

SK-20-310147.50 150.73.27 1.51 168 3.74 21C
7

SK-20-310174.50 203.028.50 3.96 39 4.48 21C
0

INCLUDI191.50 192.51.00 9.44 63 10.28 21C
NG 0

SK-20-310212.50 217.04.50 1.34 6 1.42 21C
0

SK-20-311201.24 210.89.63 4.18 5 4.25 21C
7

SK-20-312142.10 156.013.90 0.83 190 3.37 21C
0

INCLUDI142.10 143.51.40 1.86 951 14.54 21C
NG 0

AND 143.50 144.00.50 1.03 985 14.16 21C
0

SK-20-312180.00 215.435.40 1.77 21 2.04 21C
0

SK-20-318137.50 148.010.52 1.25 145 3.18 21C
2

INCLUDI138.40 139.10.78 2.14 614 10.33 21C
NG 8

SK-20-318183.50 192.59.00 1.22 9 1.34 21C
0

SK-20-319119.00 122.03.00 4.25 825 15.25 21C
0

INCLUDI119.00 120.51.50 7.60 1645 29.53 21C
NG 0

SK-20-319128.00 131.03.00 25.27 2185 54.40 21C
0

INCLUDI128.00 129.01.00 38.50 1495 58.43 21C
NG 0

AND 129.00 130.01.00 18.30 1520 38.57 21C
0

AND 130.00 131.01.00 19.00 3540 66.20 21C
0

SK-20-319134.00 146.212.25 0.98 58 1.76 21C
5

SK-20-319178.70 189.811.10 2.25 6 2.33 21C
0

SK-20-332154.50 159.34.85 2.17 57 2.93 21C
5

SK-20-332167.20 171.54.30 1.61 32 2.03 21C
0

SK-20-332191.80 194.62.85 1.13 5 1.19 21C
5

SK-20-332197.65 199.11.50 0.72 59 1.51 21C
5

SK-20-332210.65 235.424.80 2.13 34 2.59 21C
5

SK-20-333153.00 161.08.00 3.69 174 6.00 21C
0

INCLUDI155.53 156.50.97 12.25 516 19.13 21C
NG 0

AND 156.50 157.20.75 3.39 685 12.52 21C
5

SK-20-333167.00 170.83.87 0.71 50 1.38 21C
7

SK-20-333211.00 217.06.00 1.28 6 1.36 21C
0

SK-20-333220.00 236.016.00 2.15 37 2.64 21C
0

SK-20-346147.98 179.531.52 2.35 6 2.43 21B
0

INCLUDI161.40 162.41.09 11.40 6 11.48 21B
NG 9

SK-20-347147.52 151.23.73 0.86 13 1.03 21B
5

SK-20-347153.42 183.029.58 2.10 6 2.17 21B
0

SK-20-352153.50 159.05.50 3.01 44 3.60 21B
0

INCLUDI156.94 157.50.56 9.91 322 14.20 21B
NG 0

SK-20-352166.00 168.72.77 1.00 6 1.08 21B
7

SK-20-352176.00 188.512.50 3.28 5 3.35 21B
0

SK-20-358183.85 195.011.15 4.37 7 4.47 21C
0

SK-20-358200.00 204.04.00 1.19 9 1.31 21C
0

SK-20-359145.40 162.517.10 3.81 7 3.89 21B
0

INCLUDI145.90 147.01.10 13.35 24 13.67 21B
NG 0

SK-20-359165.50 177.011.50 1.67 5 1.73 21B
0

SK-20-359180.50 183.53.00 1.46 5 1.52 21B
0

SK-20-365180.50 189.59.00 3.06 576 10.74 21B
0

INCLUDI183.00 184.01.00 1.70 1135 16.83 21B
NG 0

AND 184.75 185.50.75 11.55 652 20.24 21B
0

AND 185.50 186.20.70 1.62 1365 19.82 21B
0

AND 186.20 186.70.50 14.00 2810 51.47 21B
0

SK-20-365226.00 237.511.50 2.88 118 4.45 21C
0

INCLUDI227.40 228.00.60 10.20 816 21.08 21C
NG 0

SK-20-367112.40 130.518.10 1.68 25 2.02 21C
0

SK-20-3687.63 24.5016.87 2.87 50 3.53 21C
INCLUDI9.00 10.001.00 11.75 29 12.14 21C
NG

AND 10.00 10.640.64 17.40 25 17.73 21C
SK-20-36828.25 39.5011.25 0.31 82 1.41 21C
SK-20-369150.10 152.01.91 1.38 12 1.54 21C
1

SK-20-369163.20 177.013.80 1.17 7 1.26 21C
0

SK-20-37026.50 39.5013.00 1.73 109 3.19 21C
SK-20-37045.50 57.5012.00 7.82 172 10.11 21C
INCLUDI51.50 53.001.50 24.90 361 29.71 21C
NG

AND 54.50 56.001.50 14.60 509 21.39 21C
SK-20-370109.00 125.316.35 1.23 5 1.30 21C
5

SK-20-37154.00 74.0020.00 3.92 22 4.21 21A
INCLUDI62.25 63.000.75 55.60 442 61.49 21A
NG

SK-20-37183.00 105.022.07 5.27 26 5.62 21A
7

INCLUDI95.00 96.501.50 17.00 147 18.96 21A
NG

AND 96.50 98.001.50 12.80 101 14.15 21A
AND 99.50 101.01.50 15.90 17 16.13 21A
0

SK-20-371150.00 151.11.13 1.61 15 1.81 21A
3

SK-20-371161.08 166.55.42 0.83 42 1.39 21A
0

SK-20-371169.50 171.01.50 0.88 9 1.00 21A
0

Gold Equivalent (AuEq) calculated via the formula: Au (g/t) + [Ag (g/t) / 75]. True widths range from 70-100% of reported core lengths. Length weighted AuEq composites were constrained by geological considerations. Grade capping of individual assays has not been applied to the Au and Ag assays informing the length weighted AuEq composites. Processing recoveries have not been applied to the AuEq calculation and are disclosed at 100%. Samples below detection limit were nulled to a value of zero.

Table 2: Mine Grid Drill Hole Locations and Orientations:

Hole-IDEasting Northing ElevationLength Azimuth Dip (°)
(m) (m) (m) (m) (°)

SK-20- 10,5 185. -
279 9,809.0 65.0 960.0 0 91.0
66.8


SK-20- 10,4 226. -
307 9,700.0 23.0 963.1 0 98.2
73.7


SK-20- 10,4 220. -
310 9,700.0 23.0 961.7 0 90.3
66.6


SK-20- 10,4 225. -
311 9,699.0 22.0 962.0 0 81.2
74.1


SK-20- 10,3 230. -
312 9,687.0 77.0 964.9 0 90.0
71.0


SK-20- 10,3 215. 1-
318 9,687.0 77.0 968.2 0 34.2
71.0


SK-20- 10,3 200. 1-
319 9,687.0 77.0 968.2 0 25.0
67.9


SK-20- 10,5 238. 1-
332 9,776.0 38.0 971.0 0 86.1
73.1


SK-20- 10,5 236. 1-
333 9,775.0 38.0 971.3 0 86.0
76.2


SK-20- 10,6 185. -
346 9,787.0 02.0 942.5 0 97.9
59.8


SK-20- 10,6 196. -
347 9,787.0 02.0 942.0 0 96.6
63.3


SK-20- 10,6 190. -
352 9,773.0 05.0 941.3 0 90.0
65.0


SK-20- 10,6 204. 1-
358 9,665.0 09.0 893.8 0 28.0
73.1


SK-20- 10,6 189. 1-
359 9,813.0 33.0 940.1 0 20.3
69.8


SK-20- 10,5 254. -
365 9,755.0 28.0 973.3 0 38.0
84.0


SK-20- 10,0 133. -
367 9,922.0 41.0 995.4 0 80.7
81.9


SK-20- 10,0 140. 2-
368 9,922.0 41.0 996.5 0 85.5
82.3


SK-20- 10,5 183. -
369 9,809.0 66.0 958.9 0 89.0
70.5


SK-20- 10,0 148. 1-
370 9,930.0 57.0 994.8 0 39.9
89.5


SK-20- 10,0 1, 180. 1-
371 9,881.0 79.0 030.2 0 39.9
78.9


https://www.irw-press.at/prcom/images/messages/2020/53983/27102020_Skeena_EN_PRcom.002.jpeg
https://www.irw-press.at/prcom/images/messages/2020/53983/27102020_Skeena_EN_PRcom.003.png





More information:
http://



Keywords (optional):



Company information / Profile:

PressRelease by

Requests:





PressContact / Agency:



published by: irw
print pressrelease  send to a friend  

Date: 10/27/2020 - 14:30
Language: English
News-ID 1561784
Character count: 22097
Kontakt-Informationen:
Firma: Skeena Resources Ltd.
Ansprechpartner: Feedback to businesspress24.com about Pressrelease-id:
Stadt: Wien
Telefon:

Meldungsart:
Versandart:
Freigabedatum:
Comments:



Number of hits: 175

Linking-Tips:



Direct Link to this PressRelease:






We would appreciate a link in your News-, Press- or Partner-Site.

Comments on this PressRelease






All members: 9 438
Register today: 0
Register yesterday: 0
Members online: 0
Guests online: 81


Don't have an account yet? You can create one. As registered user you have some advantages like theme manager, comments configuration and post comments with your name.